Signaling Installation
Installation works for the Ar-Riyadh Line 3 project – KSA. Installation of CBTC system (Balises), Switching Machine, Track Circuits, LED signals. Installation of Integrated Workstation System (IWS) and OCC (Operation Control Centre).